| 0
Client Login

A Model On Which to Grow

Collins Lane Elementary

61,000

Square Feet

Frankfort
Kentucky

New Construction
Project
JRA  Education Aritecture Project
JRA Education Aritecture Project JRA Education Aritecture Project JRA Education Aritecture Project JRA Education Aritecture Project JRA Education Aritecture Project JRA Education Aritecture Project JRA Education Aritecture Project JRA Education Aritecture Project JRA Education Aritecture Project JRA Education Aritecture Project JRA Education Aritecture Project

Collins Lane Elementary | Frankfort, Kentucky

This one-story elementary school was designed for an enrollment of 550 students. JRA worked closely with Franklin County Public Schools staff to create a new building upon which future elementary school projects could be modeled. The school has the latest in technology capabilities and is designed to be a low maintenance facility with its sloped metal roof, brick exterior, and internal mechanical catwalk system. A geothermal HVAC system was also designed into the project to reduce the building’s life-cycle costs. The school is also designed so that the gymnasium, cafeteria and library can be separated from the rest of the school for after-hours community functions. Features include a clerestory cupola at the intersection of the classroom corridors, and a large curved glass wall at the north side of the media center.

The building contains classrooms, a special education classroom, pre-school classrooms, resource classrooms, art and music classrooms, a computer classroom, a family resource center, administrative offices, library media center, kitchen, cafeteria, and a gymnasium.

The scope of work included the phased construction of a new building, and the demolition of the existing building. Site work included grading and storm drainage, a detention basin, new drives, parking lots, concrete paving, and fenced play yards for the pre-school as well as the elementary children. Extended canopies are integrated into the main drop-off and the pre-school drop-off. Interior finishes include durable porcelain tile in the corridors and toilet rooms, and a hardwood floor in the gymnasium.

Project Lead
Vincent Vetter, AIA
Direct: 502.657.5993 | Main: 502.583.4697

CONTACT VINCENT